Worried about how long a remodel will take? You’re not alone. At Mihalko’s, we believe in clear timelines, constant communication, and a stress-minimized experience. Here’s a typical timeline for a standard kitchen or bathroom remodel — broken down week by week.
Week 1: Planning & Prep

- Final design approvals
- Permits submitted
- Materials ordered
- Home protected (dust barriers, floor coverings)

- Removal of existing fixtures, cabinetry, flooring
- Disposal of debris
- Prep for new installations

- Plumbing and electrical updates
- Framing (if layout is changing)
- Inspections completed

- Cabinetry, vanities, tubs, shower bases
- Drywall, tiling, flooring begins
- Lighting and HVAC work

- Paint, trim, backsplash
- Fixture installation (sinks, faucets, lighting)
- Final inspections and walk-through
Each remodel varies, but most fall within this 4–6 week range. The key? A trusted contractor who stays on schedule.That’s the Mihalko’s way.